Basic Civil Engineering
In LAYOUT FINALISATION, which of the following is not the Secondary Details :-
Report Question
0%
Future expansion of switchyard should be easily possible
0%
In seismic prone zones height of structures should be as low as possible.
0%
Location and Orientation of Main Entry of Switchyard
0%
The outgoing transmission line should not cross each other
For Field Test , Significant depth of Exploration For isolated fdn :
Report Question
0%
0.5 to 1 times the width
0%
1.5 to 2 times the width
0%
2.5 to 4 times the width
0%
None
For Field Test , Significant depth of Exploration For Pile fdn :
Report Question
0%
1m to 5m
0%
5m to 15m
0%
20m to 35m
In reamed piles type of Deep Foundations :-
Report Question
0%
are constructed to a depth of 1 to 3m into the ground
0%
are constructed to a depth of 3 to 8m into the ground
0%
are constructed to a depth of 10 to 18m into the ground
0%
None
In Friction piles type of Deep Foundations :-
Report Question
0%
Terminated at Lower depth
0%
Terminated at Higher depth
0%
Terminated at Average depth
0%
None
What is the MINIMUM REQUIREMENT of Contour survey extending outside the boundary wall on all sides :
Report Question
0%
up to at least 2 m
0%
up to at least 5 m
0%
up to at least 10 m
0%
None
Which of the following is not the type of Substation Structure :
Report Question
0%
Gantry Structure–DP / Lattice
0%
Outgoing Feeder–RSJ Pole (DP)
0%
Road / River Crossing RSJ / Tubular / Lattice
0%
Equipment Support Structure –DP / Lattice
Which of the following is not the type of Line Structure :
Report Question
0%
DTR Structure –SP / DP PSC / RSJ / Tubular
0%
Equipment Support Structure –DP / Lattice
0%
Road / River Crossing RSJ / Tubular / Lattice
0%
None
Which of the following is not correct for Pole Structures :
Report Question
0%
The pole shall be erected such that minimum 1/6th of the total length of the pole shall be embedded into the ground surface
0%
Orientation of Poles structures shall be according to the loading or stringing direction
0%
The loading on the poles can be exceeded its design capacity, consider a considerable factor of safety on loads as the poles are manufactured in un-monitored conditions
0%
The pole shall be erected such that minimum 1/6th of the total length of the pole shall be embedded into the ground surface
Which of the following is not the type of Pole Foundation :
Report Question
0%
Rectangular
0%
Circular
0%
Pyramidal
0%
None
Which of the following is not Minor Equipment :
Report Question
0%
LA
0%
CT
0%
HG Fuse
0%
Isolator
Which of the following is not Major Equipment :
Report Question
0%
AB Switch
0%
VCB
0%
Transformer
0%
HG Fuse
Which of the following is type of Transformer Foundation:-
Report Question
0%
Pedestal Type
0%
Block Type
0%
Both of the above
0%
None
For Thermal Expansion and Contraction and to resist Sway Caused by Wind in Boundary Wall :-
Report Question
0%
Expansion joint at Every 2‐5 m
0%
Expansion joint at Every 4‐8 m
0%
Expansion joint at Every 12‐15 m
0%
None
Which of the following is not the type of Road :
Report Question
0%
Flexible Pavement
0%
Rigid Pavement
0%
WBM Road Foot Path
0%
Wooden Pavement
What is WBM Road Foot Path :-
Report Question
0%
Water Bound Macadam
0%
Water Below Main Road
0%
Water Between Main Road
0%
Water Bounded by main road
ELECTRICAL CONDUITS should be laid :-
Report Question
0%
AFTER PLASTERING
0%
AFTER PAINTING COMPLETED
0%
DURING BRICK WORK
0%
NONE
0:0:1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
0
Answered
0
Not Answered
0
Not Visited
Correct : 0
Incorrect : 0
Report Question
×
What's an issue?
Question is wrong
Answer is wrong
Other Reason